BeMS Estimating is a complex and subjective process, in addition to this consistency and accuracy are of the utmost importance. We can take away the pain of creating multiple points list, wiring schedules and product list, you can then add your costs and terms to provide a bespoke proposal from your organisation.
You provide the requirement and the BMS Manufacturer you would like to use. We will quickly turn this in to a design to comply with the specification requirements in a timely manner allowing you to focus on Sales generation.
We will spend time to understand the performance requirement of the BMS. Then from a library of ready built BMS kits assemble all of the equipment needed to meet the specification in the most cost effective manner.
As a minimum we will provide an extensive points list covering main plant and terminal unit controls. In addition to this there will be equipment costings, wiring specification and panel costing delivered in XL ready for import.
Our pricing is simple at £1 per point, there is a minimum charge of 200 points